1. Stormwater Projects

  2. This webpage contains short video clips of the key items from this meeting. Instead of having to watch the video of the entire meeting, you are able to watch just the portion of the meeting that is of interest to you! Simply scan down the page, read the agenda item description and click on the video to watch it. To stop the video, just click on it again. Once you start the video you will be able to use the controls at the bottom to start, stop, fast forward, rewind, switch to full screen and change your volume as well.

 

  1. 02-25-19 Arlington Countryside Flood Control Project    (1 hour)
    Arlington Countryside Flood Control Project report by Jodi McCarthy of Gewault Hamiltion Engineering.

 

  1. 09-24-18 - Arlington Countryside Flood Control Engineering Study     (2 minutes)
    Approval of a flood control engineering study for Arlington Countryside with GeWault Hamilton in the amount of $24,500.

 

  1. 09-24-18 - Eastside TIFF District Flood Control Engineering Study     (3 minutes)
    Approval of a flood control engineering study for the Eastside TIFF District with GeWault Hamilton in the amount of $39,500.

 

  1. 09-12-18 - Stormwater Project Selection     (30 minutes)
    Presentation and discussion led by Steve Berecz regarding the proposed stormwater control project locations.

 

  1. 08-27-18 - Storm Water Management Projects     (18 minutes)
    Presentation of possible city storm water management projects by Steve Berecz.
       Eastside TIF Area
       Arlington Countryside Area
       Dorset Street Study Area
       Elm Street
       Alton & Edwards Roads
       214 Wheeling Road
       Lake Claire Area and Shawn Lane House
       Patricia Lane
       Alton & Edwards Roads